
Hi,
I have one Scenario where i have two work sheet in one dashboard.
- In First worksheet will show you a line graph which includes X axis will be the Date and Y axis will be the time taken by workflow here i need latest top 6 dates and their time taken by workflow.When Ever i open a workbook Default it should be latest Date
- In second worksheet I have sub category wise time taken by workflow. It should be drill down based on latest date from the first worksheet without human interaction.And also When ever i click different dates from latest top 6 dates in First worksheet the second worksheet should be drill down
1 respuesta