Skip to main content

Hi all, 

 

I have created a waterfall chart for case id's that were assigned to a particular role first 2 and then 3.

All cases were created in 2 (as shown in the first bar)

while some cases were closed in 2  ( as shown in the second bar) and the rest moved to 3.

 

Now in the chart I have created the first bar is 1675 id's and the second is 1630 id's and the rest are in 3. 

 

In my chart I would like the second bar to start from the top of the first bar and move down as is there in a traditional waterfall chart.  I understand that I am not using a timeline here. Is it possible to achieve it? If not is there an alternate chart type that I can use?

 

Thank you all

 

Waterfall chart with count of id's,

 

Regards,

RS

1 个回答
  1. 2020年1月30日 01:35

    Hi Rishi,

     

    Can you provide some sample data with the necessary fields to determine open, closed, and cleared?  With the logic to determine those three buckets, you should be able to create the necessary Gantt calcs (start number, size) for the 1st, 2nd, and 3rd bar.

     

    Best,

    Jennifer