Hi,
I'm trying to create a table that shows project demand over time. The problem is I want to show more than 8 attributes of a project on the rows. After adding those, I can't really scroll to the left to see the project name and the first few attributes. Only the date fields are actually scroll=able. Any idea on how to fix this?
Thanks in advance.
Torio
답변 2개
Hi Torio,
This is caused by the "Maximum levels of row labels" setting, which defaults to 6. To change this, go to Analysis > Table Layout > Advanced... and increase the "Maximum levels of row labels" setting to the desired level (16 is the max), then click "OK".