My formula is at about 5300 bytes. It includes 11 instances of:
TEXT( MONTH(Start__c))& '/'& TEXT( DAY(Start__c)) &'/'& TEXT( YEAR(Start__c))
Could I format the start date in some other way to reduce the overall formula size?
Thank you.2 risposte
Is the Start__c field a date field or a formula field?. As per the documentation, you should minimize the number of references to other fields to reduce the size. I suggest looking at the example given in the documentation