Hi,
I am trying to optimise my plan so a crew is only working on one asset on a given days. This way the optimiser should try to place as much work in on that particular asset on that day. I have played around with the "same site" and "minimise" travel objectives but I am not getting the results I hoped for.
Is there a way I can utilise an existing work rule type or create a custom to achieve this?
Thanks in advance!
1 réponse
To optimize so a crew works on only one asset per day, try these steps:
- Use the “Same Site” rule to encourage working on the same asset, but it may not fully address your needs.
- Create a custom rule that restricts crews to one asset per day and maximizes work on that asset.
- Configure work type priorities and constraints to enforce and support this rule.
- Test and refine the rule to ensure it achieves the desired scheduling results.